Pgm Definition Unit Std Val Description
21 Hysteresis Voltage V 8 This parameter provides the mains and genset
voltage limits with a hysteresis feature in order
to prevent faulty decisions.
For example, when the mains are present, the
mains voltage low limit will be used as the
programmed low limit P_004. When the mains
fail, the low limit will be used as P_004+P_021.
It is advised to set this value to 8 volts.
22 Engine Heating
Temperature
ºC 50 If it is requested that the engine runs without
load until reaching a certain temperature, this
parameter defines the temperature.
23 Holdoff timer sec 8 This parameter defines delay after the engine
runs and before the fault monitoring is enabled.
24 Overcurrent / Excess
Power / Frequency Timer
sec 3 This is the period between the current or active
power goes over the limits (P_002/P_003) and
OVERLOAD alarms occurs.
This is also the period between the frequency
goes out of the limits (P_008/P_011) and SPEED
FAULT alarm occurs.
25 Wait before Fuel min 0 This is the time between the mains fails and the
fuel solenoid turns on before starting the
genset. It prevents unwanted genset operation
in battery backed-up loads.
26 Preheat timer sec 1 This is the time after the fuel solenoid is
energized and before the genset is started.
During this period the PREHEAT relay output is
energized (if defined by programming)
27 Start Timer sec 6 This is the maximum start period. Starting will
be automatically cancelled if the genset fires
before the timer.
28 Wait between Starts sec 10 This is the waiting period between two start
attempts.
29 Engine Heating Timer sec 3 This is the period used for engine heating
following the program parameter P_037.
30 Mains Waiting Timer min 0.5 This is the time between the mains voltages
entered within the limits and the generator
contactor is deactivated.
31 Cooling Timer min 1.0 This is the period that the generator runs for
cooling purpose after the load is transferred to
mains.
32 Generator Contactor
Timer
sec 1 This is the period after the mains contactor has
been deactivated and before the generator
contactor has been activated.
33 Mains Contactor Timer sec 1 This is the period after the generator contactor
has been deactivated and before the mains
contactor has been activated.
34 Stop Timer sec 10 This is the maximum time duration for the
engine to stop. During this period the STOP
relay output is energized (if defined by
programming). If the genset has not stopped
after this period, a STOP FAIL alarm will occur.
35 Start Attempts - 3 This is the maximum number of start attempts.