6.7 Remote Monitoring and Programming
Thanks to its standard serial RS-232 port, the unit offers the remote monitoring and programming
feature.
The remote monitoring and programming PC software may be downloaded from
www.datakom.com.tr internet site.
The software allows the visualization and recording of all measured parameters. The recorded
parameters may then be analyzed graphically and printed. The software also allows the programming of
the unit and the storage of the program parameters to PC or the downloading of stored parameters from
PC to the unit.
6.8 Exerciser
The unit offers automatic exerciser operation. The exercise operation may be done on a daily,
weekly or monthly basis.
The start day and time of the exercise is programmable as well as its duration. The exercise may
be done with or without load following programming.
The program parameters related to the exerciser are:
P_155: Exercise start day and hour
P_156: Exercise duration
P_157: Exercise off_load/on_load
P_158: Daily / Weekly / Monthly Exercise
Please refer to the programming section for a more detailed description of the above parameters.
When the start day and hour of exercise has come, the unit will automatically switch to either TEST
or LOAD TEST mode. The engine will run and if the on_load exercise is selected then the load will be
transferred to the genset.
If a mains failure occurs during the off-load exercise, the load will not be transferred to the genset
unless the Emergency Backup Operation is allowed by setting the parameter P_041 to 1. Thus it is
highly recommended that the Emergency Backup mode enabled with off-load exerciser.
At the end of the exercise duration, the unit will switch back to the initial mode of operation.
If any of the mode selection keys are pressed during exercise, then the exercise will be ended.
Using the daily exercise mode, the unit may feed the load from the genset during predefined hours
of the day. This operation may be used in high tariff periods of the day.